Can the CHIPS Act endure a Trump administration?
In Rio Ranco, NM, a technician employed in manufacturing at Fab 11X by Intel examines a wafer used in semiconductors.
In Rio Ranco, NM, a technician employed in manufacturing at Fab 11X by Intel examines a wafer used in semiconductors.
The inaugural fab at TSMC Arizona is set to manufacture semiconductor technology with a scale of 5nm; its production is planned to commence in the initial six months of 2025. The subsequent fabrication facility will employ a 3nm process, and there are intentions for a third facility to adopt a 2nm technology. These facilities are slated to be operational from 2028 onwards.
